英文字典,中文字典,查询,解释,review.php


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       


安装中文字典英文字典辞典工具!

安装中文字典英文字典辞典工具!










  • IPC 417. 4. 1 Shower Tub Walls - The Building Code Forum
    What products are approved for compliance with this code? Bathtub floors, shower floors, wall areas above built-in tubs that have installed shower heads and walls in shower compartments shall be constructed of smooth, corrosion-resistant and nonabsorbent waterproof materials Wall materials
  • Shower Pan Requirements - The Building Code Forum
    As I design my new bathroom Must a shower ALWAYS have a 2" curb all around it? Would having a second drain allow me to have a curbless pan? I'd like the shower to be open to the bathroom, with the bathroom floor in general serving as the shower pan Toilet can be wall-mounted, eliminating
  • Shower pan | The Building Code Forum
    Does the shower pan have to slope towards the drain or can it be flat and only the finished shower floor is required to slope towards the drain? The code is the CPC Not the IRC 411 talks about a shower receptor that requires a slope If that receptor is the stall itself and the finish floor
  • Waterproofing shower pan seat - The Building Code Forum
    I’m trying to determine if our shower remodel was done to CA code, as I can’t find exact answer in the code myself The GC sub used Oatey Perfect slope (cardboard strofoam sheets), then Oatey PVC shower pan liner directly over that Cement board overlapped liner on walls and RedGard on walls and seat Seemed solid
  • Discontinuous Gyp. Bd. at shower pan at fire partition
    R-2 construction, 2009 IBC I've got shower pans that abut corridor walls and party walls (1 2 hr partitions) in a three story apartment building The plans call for the assembly to be continuous all the way to the floor and an additional layer of 1 2" green board be added at the shower
  • Shower membrane (s) for tiled shower over slab on grade?
    In the bathroom, I've shown a curbless shower with a tile floor finish, pitched 1 4" per foot to a linear drain along the far wall I've spec'd the Schluter family of products for the walls, floor, and linear drain, with their heat mat + membrane product set on top of the sloped concrete, with tile set on top of the sloped membrane
  • Inspection of Shower Tub - The Building Code Forum
    Then they come back to inspection the insulation and they dont want the tub or air block in the way My question is are they going to make a special trip to inspect the air block before I can install the tub shower ? I will be holding up the dry wall crew while the inspector takes his time of 2 or 3 days to come out
  • Vapor Barrier Required At Shower? - The Building Code Forum
    A building inspector is telling my contractor that he needs to install a vapor barrier behind the cement board at a shower enclosure This is a single family house It's not on an exterior wall Is there any portion of the IRC or other code that requires this? I can't think of one


















中文字典-英文字典  2005-2009