英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
prehensible查看 prehensible 在百度字典中的解释百度英翻中〔查看〕
prehensible查看 prehensible 在Google字典中的解释Google英翻中〔查看〕
prehensible查看 prehensible 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Limberlost | George Brown College
    Limberlost Place is years ahead of Toronto's 2030 goals for sustainable design (Toronto Green Standard) and performance for new developments, and it has become a global model for mass timber sustainable construction
  • Limberlost Place - Moriyama Teshima Architects
    A model for 21st century smart, sustainable, green building innovation, the 225,000 SF, net-zero carbon emissions Limberlost Place sets a precedent through its mass timber structural solution – accelerating the development of the Canadian forest products industry
  • Limberlost Place: Inside Canadas First Institutional Mass Timber Tower
    Sitting proudly on George Brown's waterfront campus, the building is loaded with sustainable design moves and boasts net-zero carbon emissions, a LEED Gold certification, and compliance with the Toronto Green Standard Tier 4
  • A new era of innovation and sustainability - The Dialog
    As the first mass timber institutional building of its kind in Ontario, Limberlost Place is not just a campus addition—it represents a monumental leap forward in architectural innovation and environmental stewardship
  • Ontario’s First Mass-Timber, Net-Zero Institutional Building . . . - PCL
    Designed by Acton Ostry Architects and Moriyama Teshima Architects with PCL Construction managing construction, Limberlost Place will be home to GBC’s schools of architectural studies and computer technology, and the Brookfield Sustainability Institute
  • Limberlost Place achieves substantial completion - Link2Build
    At substantial performance, Limberlost Place is already five years ahead by reaching Tier 4 of the Toronto Green Standard, hitting 2030 targets as the city aims to transition to net-zero emissions Limberlost Place also spurred changes to the provincial building code
  • George Brown College marks Major Step as Limberlost Place Nears . . .
    It’s made using Canadian-sourced wood and built with sustainability in mind The project was led by Moriyama Teshima Architects and Acton Ostry Architects, with construction by PCL The college says the building meets environmental standards Toronto doesn’t require until 2030
  • GBC’s Limberlost Place sets the scene for Canada’s first Green . . .
    Limberlost Place, the college’s 10-storey, mass-timber, net-zero carbon emission building currently under construction at the Waterfront Campus, provides a leading example of the type of green building that will result from the new strategy
  • George Brown’s Limberlost Place reaches substantial performance . . .
    At substantial performance, Limberlost Place is already five years ahead by reaching Tier 4 of the Toronto Green Standard, hitting 2030 targets as the city aims to transition to net zero emissions Limberlost Place also spurred changes to the provincial building code
  • Limberlost Place - George Brown College
    Ontario’s first mass timber, net-zero carbon emissions institutional building of its kind, George Brown College’s (GBC) Limberlost Place has set the precedent for mass timber construction as a model for 21st century smart, sustainable, green building innovation





中文字典-英文字典  2005-2009