英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:

unmodified    
未变性的; 未改性的



安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Investigation of Welding Heat Input Influences on the . . .
    The correlation of welding input heat and microstructure and its impacts on multi-pass mechanical properties in storage tanks alloy steel plate of thickness 6mm using multiple passes SMAW was
  • 6DUDMHYR - ResearchGate
    (See Sec 8, UCS-56 UHT-56),,,,,, PreHeat req (See Sec 8 App R)
  • 表紙等 - jimm. jp
    MnMoNi鋼の焼戻しにおける炭化物析出挙動 やなぎさわゆうすけ(株)日本製鋼所 室蘭研究所 柳沢祐介 A25 Ni-Al系反応焼結体の気孔率制御 てしろぎゆうや北大工 手代木悠也,大参達也,熊谷剛彦,井口学 A26 構造不規則Ce-Ru 合金の重い電子状態へのLa置換効果
  • Spanish National Action Plan on Ageing Management Topical . . .
    In compliance with this mandate, the CSN drew up, by the end of 2017, the National Assessment Report (NAR), including analysis of the Overall Ageing Management Programme applicable to the Spanish nuclear power plants on the basis of the regulations in place in Spain, as well as its specific application for the systems, structures and components selected in the specification, which were the
  • BCU1-M10-0123 | BCU1 FB-CHAMFMAKER Z4 90° BUI
    BCU1-M10-0123 | BCU1 FB Chamfmaker Z4 90° BUI Cooling
  • {EBOOK} Welding Positions According To Iso 6947
    GB T 24598-2009 Translated English of Chinese Standard (GBT 24598-2009, GB T24598-2009, GBT24598-2009) https: www chinesestandard net 2018-10-19 This standard specifies the requirements for qualification of welders for fusion welding of aluminum and aluminum alloys To ensure that the exam is suitable for different product types, regions, and testing organizations, this standard provides a
  • Assessment of Full Power Turbine Trip Start-Up Test for
    Pretest calculations showed a fair agreement when compared against plant data However post-test calculations were to be carried out in order to improve code prediction because of the following reasons: a) several parameters of control systems were adjusted during the start-up tests, b) final part load diagram was slightly different from the nominal one, c) primary mass flow used in pretest





中文字典-英文字典  2005-2009